Monday, September 23, 2013

Photo updates!

The house was getting the termite guard put in when we dropped by over the weekend. We are in the last few weeks and could possibly have pci next week.
Peeking through the windows and doors, it looks like all the door handles are in, towel rails on and electrical is completed.

Tuesday, September 17, 2013

Plumbing

We dropped by again on Sunday and the tapware, bathtub and toilets have been installed. The tiles that were faulty in the laundry were fixed up too and the missing tiles that were due to be put in after the tapware were in too. Looks like the tilers came in after we left on Saturday.

Left my phone at home so don't have any photos unfortunatel.

Here's a photo of the porch tiles that I took on Saturday:

Friday, September 13, 2013

So much has happened!

This morning we met our SS on site and so much has happened since we went on holidays. Tiles in the bathroom are now done, sinks have been put in, caeserstone benchtops installed and we have had our first coat of paint. Our SS told us that later today we should have our plumbing done so toilets and bathtub should be in!

We are getting so close to the end. Can't wait!







Monday, September 2, 2013

Tiles!

Dropped by this morning and the tilers were there so we went in to have a look. The kitchen cabinets, wardrobe doors, internal doors and architraves have now been put in.